Surveying Services in Oldham
GPR Sheepfoot Lane
For this project on Sheepfoot Lane in Oldham, we employed innovative Ground Penetrating Radar (GPR) and electromagnetic location technology to meticulously clear eight borehole locations before drilling commenced.
Recognising the critical importance of avoiding any disruption to existing underground utilities, our team used GPR to scan and map the subsurface conditions with high precision, detecting the presence and depth of buried services such as water pipes, electrical cables, and gas lines. Complementing this with electromagnetic locators, we ensured an accurate identification of utility lines to prevent any accidental strikes during the drilling process.
This thorough and advanced survey approach allowed us to provide our client with detailed and reliable data, significantly mitigating the risk of encountering underground services and ensuring a smooth and safe drilling operation. The successful application of these technologies underscored our commitment to precision and safety in site preparation, essential for the efficient progress of the project.
Client details
Ian Farmer Associates
service provided
Borehole Clearance
Project timeline
1 day on site approx. 0.5 days in the office
Leeds
Doncaster
Sheffield
Bradford
Hull
Halifax
Sunderland
Newcastle
Middlesborough
Yorkshire Moors
Teesside
Cumbria
Harrogate
York
Yorkshire Dales
Goole
Carlisle
Keswick
Kendal
Barrow-in-Furness
Lancaster
Blackpool
Morecambe
Southport
Liverpool
Wigan
Manchester
Blackburn
Burnley
Forest of Bowland
Oldham
Chester
Stockport
Peak District
Skipton
Crewe
Rotherham
Stoke
Driffield