Gisburn Forest

The specification for our project in Gisburn Forest involved conducting a comprehensive Topographical Survey for the installation of new telecommunications masts near Stocks Reservoir, Clitheroe.

The primary objective was to survey approximately two miles of road where electric cables would be installed to connect to the new masts. This detailed survey was essential for planning the optimal route and ensuring the successful implementation of the cable infrastructure.

To achieve this, we established GPS control across the entire length of the site to ensure the best fit for Total Station (TS) data. By traversing the full length of the road, we meticulously measured all relevant road details and widths, extending to the boundaries on either side. This included capturing precise information on road gradients, surface conditions, and any existing features that could impact the cable installation.

The GPS control points provided a reliable framework for integrating the data collected from the Total Station, ensuring high accuracy and consistency throughout the survey. This dual approach allowed us to produce a detailed and accurate topographical map of the road and its surroundings, highlighting all critical aspects that needed to be considered for the cable installation.

The survey data was instrumental for the engineering team to plan the route of the electric cables, ensuring they could be laid efficiently and safely without disrupting the existing road infrastructure or the surrounding environment.

Client details

Clarke Telecom

service provided

Topographical Survey

Project timeline

5 days on site approx. 2 days in the office